Shanks South Kirkby
An iPECS in Industrial Case Study
Video Case Study
About Shanks South Kirkby
With sites across Europe and Canada and revenues of over £600m, Shanks Group are a World leader in waste management. The Group uses a range of sustainable technologies to make valuable products from what is thrown away.
The Challenge
- Overcoming the environmental challenges of deploying communications tools into a complex industrial site
- Incoming call awareness over loud machinery
- Mobile extensions deployment throughout the site
- Restricting external call access
- Reliable and resilient communications across multiple sites
- Central control of the network to remotely run diagnostics and manage maintenance
- Shared system access with local council
- A cost effective deployment that meet strict safety guidelines
- Support operational efficiency goals across the new site
The Solution
Key Features
The solution provides a standardised platform across the entire Shanks site giving the ability to communicate effectivity and the core technology and functionality behind it is excellent.